JMK’s vision was to transform the iconic Telephone House into a contemporary hotel destination. BME led the full electrical install within a complex retrofit — managing tight site logistics, overlapping trades, and a demanding programme to deliver a world-class 290-room facility.
Developer/Main Contractor: JMK/Stewart
Architect: JFA Architects/ADS Design
Consulting Engineer: Homan O'Brien
Completion due: January 2026
The city-centre location and the nature of retrofitting an existing iconic structure presented considerable challenges:
BME responded with a proactive, hands-on approach, emphasising on-site collaboration and precision in service installation. Their solutions included:
Despite the significant spatial and scheduling limitations inherent in this city-centre retrofit, BME delivered a snag-free electrical installation. Their commitment to quality and efficient execution played a vital role in enabling JMK to open the Telephone House Hotel on time and to the specified high standards, with an expected completion in March 2026.
From 500-unit apartment blocks to fast-paced fit-outs, we’re ready to help you deliver - with certainty and zero fluff.